Hardware supply

Specified for the job, delivered configured, not dumped in boxes.

01

Who it's for

You are probably here because

  • 01

    You have a device list and want it priced properly.

  • 02

    You are onboarding twenty people next month.

  • 03

    You have been quoted for a spec you are not sure is right.

  • 04

    Old kit needs disposing of, and the data on it needs handling.

02

What's included

What you actually get.

This is a quotation service, not a webshop. Send us a device list or tell us what the machines are for, and we will specify, source, image, tag and deploy them on site.

01

Workstations, laptops and thin clients

Specified for the actual work.

02

Servers, storage and GPUs

Including AI compute, sized by workload.

03

Switches, routers, access points, firewalls

Matched to the network design.

04

UPS, racks, cabling and accessories

Sized to the load, not to the box.

05

Printers, scanners, POS peripherals

Configured and tested before delivery.

06

Imaging, asset tagging and rollout on site

So day one is a working desk.

07

Warranty handling and trade-in disposal

Including certified data destruction.

04

How it runs

Each stage, and what it produces.

  1. 01

    Specify

    We start from the job, not from the catalogue.

    Output

    A specification with alternatives at different price points.

  2. 02

    Quote and source

    Lead times and warranty terms stated plainly.

    Output

    A quote you can put to procurement.

  3. 03

    Prepare

    Imaging, asset tagging, configuration, testing.

    Output

    Machines that are ready to use, not ready to unbox.

  4. 04

    Deploy and dispose

    On-site rollout, and old kit handled properly.

    Output

    An asset register, and a data destruction certificate.

What you are handed

  • An asset register with serials, tags and locations
  • Machines imaged and configured to your standard build
  • Warranty terms and lead times stated in writing
  • Certified data destruction for anything disposed of

Technology

DellHPLenovoSupermicroNVIDIAUbiquitiMikroTikAPCSynology
05

Proof

One project, in full.

Stock and dispatch system for a regional distributor SMEs and startups Example

Stock and dispatch system for a regional distributor

Four branches on separate spreadsheets, month-end taking a week.

One day

Month-end close

DjangoPostgreSQLM-Pesa DarajaBarcode

Four branches tracked stock in separate spreadsheets. Dispatch errors were routine, nobody could see group stock in one place, and month-end close took a week of reconciliation that one person held in their head.

One day

Month-end close

Four

Branches on one system

Single view

Group stock

Read the full case
06

Commercials

How buying this works.

Engagement
Supply and install: equipment at quoted cost plus a stated installation fee.

Price
On request, after scope

How pricing works

What sets the price

Equipment cost, quantity, lead time, and how much preparation each machine needs before it reaches a desk.

We quote the hardware and the installation separately, so you can see what each is costing you.

Every project is quoted after we understand the scope. You will have a written, fixed quote before any build work begins. No open-ended billing.

07

Questions

Answered plainly.

Yes. The installation fee is separate and optional, though for a rollout of any size the imaging is what makes day one work.

Stated in every quote, per line. Anything imported carries a longer one and we will say so rather than discover it later.

Yes, on trade-in or for disposal, with certified data destruction either way.

Send it over. We will tell you honestly whether the spec is right for the job before we talk about the price.

Infrastructure

Send us a device list

Or tell us what the machines are for and we will specify them.

We reply to every enquiry within one working day.

WhatsApp us